Project Overview
Wenergy supported the delivery of an integrated energy solution for AWI Immobilien, helping connect two production halls into a single intelligent energy system. By combining existing rooftop PV installations with battery energy storage and EV charging infrastructure, the project enhances energy efficiency, reduces operating costs, and prepares the facility for future energy demands.
![]()
Solution Highlights
The system integrates 396.4 kWp of solar PV, two Stars Series 289KWh ESS Cabinets with a total capacity of 578 kWh and 250 kW charge/discharge power, as well as a 50 kW DC fast charger. Intelligent Modbus energy meters provide real-time visibility into all energy flows, enabling advanced energy management and optimized coordination between generation, storage, charging, and consumption.
![]()
Customer Value
The solution is expected to reduce peak demand by approximately 100 kW, significantly lowering demand-related electricity costs while improving self-consumption of solar energy. With an estimated payback period of around 7.3 years, the project delivers both economic and environmental benefits. More than just installing battery storage, this project demonstrates how an integrated approach—bringing together PV, BESS, EV charging, and intelligent energy management—creates a more resilient, efficient, and future-ready energy system for industrial and commercial applications.