Integrated ESS Project in Poland

2026-02-13

Project Overview


Wenergy deployed a 250kW / 516kWh Commercial & Industrial Battery Energy Storage System (C&I BESS) for a bus charging station in Poland.


The project integrates on-site photovoltaic (PV) generation with energy storage to maximize solar self-consumption and reduce grid electricity costs associated with nighttime bus charging.


latest company case about [#aname#]


Operating Logic


Daytime Operation: The system automatically charges using excess on-site solar generation, increasing PV utilization efficiency.


Nighttime Operation: Stored energy is discharged to power bus charging activities, reducing dependence on high-cost grid electricity.



Key Value

  • Maximized PV Self-Consumption: Improves utilization rate of locally generated solar energy

  • Reduced Grid Dependency: Offsets nighttime charging demand with stored renewable energy

  • Lower Operating Costs: Avoids peak grid electricity prices

  • Supports Sustainable Transport: Enables clean energy integration into public bus charging infrastructure


This project demonstrates how a compact energy storage system enhances renewable energy utilization and optimizes operational efficiency in EV charging applications.